DPR_207_2010In Italy, the D.P.R. 5 October 2010 n.207 “Execution and implementing rules of D.Lgs 163/2006” on the verification activities of projects is known for quite some time. As the transition period finished in June 2014, the contracting entities identified by the rules as first responsible for the verification activities are obliged to adopt an internal system of quality control if they want to act through its own facilities.
The decree stipulates that the verification process, as well as the validation activities, is the proper function of the contracting entity and is aimed at checking the conformity of the chosen project solution to the specific functional, regulatory, technical and performance provisions included in the feasibility study and all design documents.